3S Pedras

What leaves well packed arrives whole.

Stone is heavy and fragile at the same time. Packing is where an order is won or lost.

Loaded truck leaving the plant

Loading

How the cargo leaves.

Small format goes on pallets, strapped and film-wrapped. Large pieces and countertops go in wooden crates built around the piece.

Container loading is planned by weight and by piece size. The quantity per container is confirmed with the packing list of each order.

Documents

What comes with the cargo.

Packing list

Piece-by-piece detail: format, thickness, quantity per pallet and total square metres.

Commercial invoice

Consolidated by product, in square metres, matching the packing list.

Export documents

The documentation required for the destination, prepared with our customs broker.

Good to know

Before the first order.

Tone varies between lots

Natural stone has veining and colour variation. The physical sample is the reference, and buying the full quantity at once avoids mismatched replacement.

Incoterms

We quote FOB or CFR. Port of loading and freight are confirmed per order.

Lead time

Production time depends on format and quantity, and is confirmed in the quotation.

Samples

Physical samples can be sent before the order. Ask for them together with the quotation.

Ask for a loading plan.

Tell us the volume and we come back with packing and container detail.